[ posts only (not attachments) ]

ISSUES/LOCATIONS

View titles only
(by date)
List all documents, ordered…

By Title

By Author

View PDF, DOC, PPT, and XLS files on line
RSS

Add NWW documents to your site (click here)

Sign up for daily updates

Keep Wind Watch online and independent!

Donate $10

Donate $5

News Watch

Selected Documents

Research Links

Alerts

Press Releases

FAQs

Publications & Products

Photos & Graphics

Videos

Allied Groups

Resource Documents: Ordinances (50 items)

RSSOrdinances

Documents presented here are not the product of nor are they necessarily endorsed by National Wind Watch. These resource documents are provided to assist anyone wishing to research the issue of industrial wind power and the impacts of its development. The information should be evaluated by each reader to come to their own conclusions about the many areas of debate.


Date added:  November 27, 2015
Maine, OrdinancesPrint storyE-mail story

Town of Freedom Wind Turbine Ordinance

Author:  Town of Freedom, Maine | Maine, Ordinances

9.1 Wind Turbine Classifications Type 1 – Small Wind Turbine means a wind turbine with a nameplate capacity less than 10 kW, and a turbine height less than 150 feet. Type 2 – Intermediate Wind Turbine means a wind turbine with a nameplate capacity between 10 kW and 100 kW, and a turbine height less than 150′. Type 3 – Large Wind Turbine means up to three wind turbines with a nameplate capacity less than 1 MW, and a turbine . . .

More »

Bookmark and Share


Date added:  June 15, 2015
Maine, OrdinancesPrint storyE-mail story

Wind Energy Facility Ordinance for the Town of Dixfield

Author:  Dixfield, Maine | Maine, Ordinances

Section 11. Approval and Performance Standards 11.1 Setback A WEFU or WEFS shall comply with the following setback requirements. If more than one (1) set back requirement applies, the greater set back distance shall be met. All measurements shall be based on horizontal distances. 11.1.1 All WEFUs shall be set back a horizontal distance of four thousand (4,000) feet from any Occupied Building in Dixfield and two thousand (2,000) feet from the boundaries of the Project Parcel unless the Applicant . . .

More »

Bookmark and Share


Date added:  October 12, 2014
Noise, Ontario, OrdinancesPrint storyE-mail story

By-law to provide for the regulation of wind turbine noise

Author:  Corporation of the Town of Plympton-Wyoming | Noise, Ontario, Ordinances

In this by-law: “A-weighting” means the frequency weighting characteristic as specified in the International Electrotechnical Commission (IEC) Standard 61672, and intended to approximate the relative sensitivity of the normal human ear to different frequencies (pitches) of sound. It is denoted as “A”. … “Infra-sound” means sound with energy in the frequency range of 0-20 Hz. It is often considered to be inaudible for most people unless at a relatively high amplitude but has been shown to be perceived via other senses . . .

More »

Bookmark and Share


Date added:  October 4, 2014
Kentucky, OrdinancesPrint storyE-mail story

Wind Energy Conversion Systems Ordinance – Mason County, Ky.

Author:  Mason County, Ky., Fiscal Court | Kentucky, Ordinances

Definitions: Industrial Scale WECS: A Wind Energy Conversion System constructed on the property ofanother by a company or corporation or other entity, whose general intent is to capture wind energy and place it on the electrical grid for resale to a public utility or other energy marketer. Mid-Scale WECS: A Wind Energy Conversion System with a generating capacity up to 50 Kw, the installation intended to collect wind energy for the purpose ofsupplying energy to the owners and shall not . . .

More »

Bookmark and Share


Earlier Documents »

Get the Facts Follow Wind Watch on Twitter

Wind Watch on Facebook

Share

CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.
Share

Wind Watch on Facebook

Follow Wind Watch on Twitter